Edinburgh Tram Project. As part of this report, a draft Design Manual prepared by the Consultants, Gillespies, was presented to Councillors. This followed on from a Councillors’ Workshop on 14 November It was agreed that the views of key parties should be sought and these reported back to this Committee. The parties referred to were. · Edinburgh Tram Project: Design Manual Planning Committee 16 June I 1.I 2 3 Purpose of report To present a refined version of . out in the Design Manual (see ). Tram Stops For the purposes of this assessment the scheme has been assumed to include a total of 22 tram stops, located at approximately evenly distributed distances around the loop (see Figure ). The final location of tram stops will not necessarily be exactly as shown, however, the design has been.
Edinburgh Tram Project. As part of this report, a draft Design Manual prepared by the Consultants, Gillespies, was presented to Councillors. This followed on from a Councillors’ Workshop on 14 November It was agreed that the views of key parties should be sought and these reported back to this Committee. The parties referred to were. defenders design materials) ò (i) Edinburgh Tram Design Manual dated December (the Manual) ò (ii) Goudappel Coffengs report, Cycling and the Edinburgh Tramway, dated November (Goudappel Coffeng) and (iii) Edinburgh Tram Cycle Integration Study, Final Report prepared for TIE, dated July (Integration). PART 2 - DETAILED DESIGN REQUIREMENTS 5(A). TRAM IDENTITY This chapter sets out Detailed Design Requirements for the Tram system. The requirements are framed as guidance and as a detailed checklist and these will be used primarily in the procurement process. TRAM It is expected that the trams bought to operate the Edinburgh Tram System will be.
adhering to Sport England guidelines and taking on board local concerns, introducing a bold exterior design and keeping to tight deadlines. Construction on Edinburgh's trams project will stop this week "to distancing guidelines, including design, planning and scheduling. Optimism Bias Treatment at the Edinburgh Tram Project. Design, build, finance, manage and operate contracts documentation at any given stage.
0コメント